Banks Renewables’ Kype Muir Extension Wind Farm South Lanarkshire We have recently completed two years of work at the above Wind Farm whereby we created and surfaced the access roads around the 15-turbine site, paving the way for the UK’s tallest and most efficient onshore turbines, which stand at 200m tall. The wind […]
Beith Town Centre Regeneration Main Street Improvements Hamilton Tarmac have recently completed the above Project in conjunction with the Client, North Ayrshire Council Included in the works was the removal of the existing surface and the installation of new drainage channels, block paving and surfacing to the carriageway and footway areas. Hamilton Tarmac worked in […]
New Street – Stevenston The Scope of the Contract involved the alteration of New Street, situated in Stevenston town centre, from an existing two-way traffic system to a one-way system in a southbound direction. The west footway was realigned, and drainage channels installed The existing footways were widened and resurfaced. New drainage was installed, and […]
Construction of a New Cycleway Loans to Troon: Phase 2 Hamilton Tarmac have recently completed the above Project in conjunction with the Client, Ayrshire Roads Alliance and South Ayrshire Council The Project called for the construction of approximately 1000 metres of 3-metre-wide segregated cycleway and 2-metre-wide footway from Dundonald Road to North Drive, Troon, […]